Thursday, September 2, 2021

Before and After



 Our driveway was finished on Tuesday afternoon.  What a difference!

Before:


After:


We had trouble with water getting into basement so we had a French drain put in.  He lined the trench he dug with pond liner first, then laid the perforated pipe.  A solid pipe continued under the driveway down to the barn.


Before:


After:

We have access to the barn as a garage, once the cement slab is fully cured and we have a turnaround.



It was amazing to see him with the excavator.  He never once banged the house or barn.


This morning after a hard rain from Ida the driveway is even more settled and packed down.  It's called hard pack.  .

Another contractor done.  Next is the house painter coming this month.  

The barn whisperer has been notified that the grading and driveway are complete.   His wife drove by as we ate our lunch on the front porch.  She stopped to remark on how well it all looked.  Next up for the barn, hopefully before winter, are doors and leveling the left side of the barn.